EDC was awarded prime contractor for the Oak Bluffs wastewater ejector pump control upgrade. Scope included modifying spare control panel and build of remote instrument panel to remove existing panel from flood zone and re-locate main panel 1000’+ away on aux framing. Project also included excavation for new duct banks, Concrete work, Demolition of existing pump shed, Installation of ultrasonic level sensor in existing wet well, Site restoration and coordinating ferry’s reservations around busy tourist months of Marthas Vinyard. At no time was any pump disrupted during migration.